Safety First at Chesterfield Hospital
We are thrilled to share that our efforts towards our safety practices and procedures have been credited with a Safety Award.
We are currently on site at the Chesterfield Hospital, delivering the project with Vinci Construction. Works have commenced on the £24m Urgent Care Unit, where laying foundations have begun and the Service diversions already completed which allowed the main works to begin.
Our Enabling Works includes:
- Substructures – Pad foundations and retaining walls
- Associated utilities infrastructure
- Hard Landscaping
- Site strip followed by a cut and fill with surplus materials removed from site
- FW & SW Drainage works
- Ground Floor and upper floor concrete slab works
- External works – paving and kerbs
We even made an appearance on Calendar News the same day! Watch the full clip here – 2.52mins in: https://lnkd.in/gnefqfaN