Works have commenced on a significant city centre development in Hull, where a new £18m facility for NHS Hull University Teaching Hospitals has begun. The Community Diagnostic Centre (CDC) at Albion Square will feature a range of services including MRI, X-ray, CT scanning and ultrasounds to help identify health problems earlier and reduce waiting times on acute hospital sites. Working alongside one of our key clients Vinci, our project scope includes:

  • Substructure RC Works – Pile Cropping
  • Pile Caps
  • Lift & Stair Core Foundations
  • Ground Beams
  • Ground Floor Slab
  • Waterproofing
  • Service Entry Pits & Walls
  • Underground Drainage
  • Superstructure RC Works – 1st & 2nd Floor Suspended Floors (1,000m2 per each floor) 
  • Lift & Stair Core Walls 
  • Columns  
  • Roof Parapet Walls
  • Stairs (stair master)
  • Craneage.

   

Key items

  • 2,000m3 structural concrete
  • 350t Reinforcement
  • 6,000m2 Formwork
  • Waterproofing.

Our works are currently in their infancy, with preparatory work underway. So far, these works include:

  • Stair and lift core pours
  • Foundation pours ­
  • Formwork to the foundations
  • Installation of perimeter wall
  • Removal of arisings
  • Crawler crane arrival in couple of weeks

We look forward to seeing how the project develops over the coming months, and the transformation which will capture the public’s interest.