Works have commenced on a significant city centre development in Hull, where a new £18m facility for NHS Hull University Teaching Hospitals has begun. The Community Diagnostic Centre (CDC) at Albion Square will feature a range of services including MRI, X-ray, CT scanning and ultrasounds to help identify health problems earlier and reduce waiting times on acute hospital sites. Working alongside one of our key clients Vinci, our project scope includes:
- Substructure RC Works – Pile Cropping
- Pile Caps
- Lift & Stair Core Foundations
- Ground Beams
- Ground Floor Slab
- Waterproofing
- Service Entry Pits & Walls
- Underground Drainage
- Superstructure RC Works – 1st & 2nd Floor Suspended Floors (1,000m2 per each floor)
- Lift & Stair Core Walls
- Columns
- Roof Parapet Walls
- Stairs (stair master)
- Craneage.
Key items
- 2,000m3 structural concrete
- 350t Reinforcement
- 6,000m2 Formwork
- Waterproofing.
Our works are currently in their infancy, with preparatory work underway. So far, these works include:
- Stair and lift core pours
- Foundation pours
- Formwork to the foundations
- Installation of perimeter wall
- Removal of arisings
- Crawler crane arrival in couple of weeks