Education

Mustard Wharf

This project consisted of 250 PRS apartments split over three individual buildings. The scheme includes a mixture of A3, B1, and D1 uses at ground floor level centred around a new pedestrian boulevard connecting the scheme with the adjacent Tower Works development.

Client : Sir Robert McAlpine
Value : £9m
Location : Leeds
Duration : 73 Weeks

  • Construction of RC raft slabs, drainage, concrete superstructure over three buildings
  • BLOCK A – 22m HIGH, 7 FLOORS. 950sqm
  • BLOCK B – 29m HIGH, 10 FLOORS. 1000sqm
  • BLOCK C – 31m HIGH, 11 FLOORS. 800sqm
  • 3x SLIPFORM CORES
  • 1x Jumpform stair core
  • Extensive muck shift
  • Reinforcement fixed 1655T
  • Concrete placed 10700m3