The AMZL facility is a new logistics centre soley for Amazon van distribution. The project consisted of the installation of the warehouse sub-structure, large drainage channels, road kerbs, ducting works which included future proof infrastructure for van charging points, gas and water utilise, sub-base installation ahead of tarmac works, import and level 4500m3 of topsoil, install precast walls to dock levellers.
Client : | TSL | Value : | £1.5m | Location : | Ipswich | Duration : | 12 weeks |
- Foundations
- 12,500mtrs of below ground ducting infastructure for future van charging system
- 1,500mtrs of GRP cable troughs
- 1,000mtrs of drainage channels
- 3200mtrs of road kerbs Substation
- 35,000m3 van park
- Services
- 12,800mtrs of duct
- 171 number draw pits
- 1200 mtrs of GRP service duct units