Pinderfields Hospital

Pinderfields Hospital

Client : Balfour Beatty Construction Limited
Value : £13.5m
Location : Wakefield

  • Bulk excavation
  • Construction of foundations
  • RC Retaining Walls
  • Drainage and service installation
  • Construction of attenuation tanks
  • In-situ concrete structures
  • Section 278 works
  • External works
  • Car park construction including access spine road and roundabouts.

Pontefract General Infirmary

The works consisted of bulk excavation of 32,000m3 of inert material, installation of pad foundations, drainage networks including attenuation system, in-situ concrete structures;

including energy centre and the construction of new car parks and hard landscaped areas to form the new £80 Million Pontefract Hospital in West Yorkshire.

In-situ concrete structures including energy centre and the construction of new car parks and hard landscaped areas to form the new £80 Million Pontefract Hospital in West Yorkshire.

Client : Balfour Beatty Construction
Value : £8.3m
Location : Pontefract West Yorkshire

  • Bulk excavation
  • Sub-structure foundations
  • New drainage systems, including attenuation
  • Service diversions
  • In-situ superstructure concrete
  • External works

NHS Nightingale Hospital

Client : Leeds Teaching Hospitals Trust
Value : £80 000
Location : Convention Centre Harrogate
Time : 2 Weeks

  • Construction of ground bearing reinforced concrete slabs for: Oxygen Tanks & Ancillary Equipment
  • CT Scanner Bases (including removal & palletising of existing block paving)
  • Removal of external concrete staircase & construction of reinforced concrete emergency escape ramp from Hall Q.
  • Bolting down the oxygen tank & ancillary equipment base-plates to the reinforced concrete foundations.
  • Sealing of cracks & concrete repairs to floors in Halls A, B, C & M prior to laying vinyl floor coverings.
  • Removal of trees & shrubs from soft-landscaped area adjacent to the Goods Yard entrance on Springfield Avenue (for positioning of the first Oxygen Tank Base – subsequently cancelled)
  • Removal of bollards (6no) from the front of the Royal Hall
  • Removal of bollards (11no) from the Junction of Ripon Road & Kings Road (in front of Hall M)
  • Concrete repairs / levelling of 2no door thresholds in Hall Q
  • White-Lining (Pro-Line) to:
  • Demarcate footpaths around CT Scanner & Oxygen Tank bases
  • Ambulance bays
  • Arrange for checking & jetting/cleaning (Pro-Jet) of external drainage including manholes, gullies & channel drainage systems. Lifted all accessible covers to inspect followed by high pressure water jetting & flow testing
  • Service yards within the Conference Centre running between Springfield Avenue (In) & Kings Road (Out)
  • Full external perimeter of the Conference Centre
  • Channel Drain in front of Hall C Roller Shutter Door (Service Road Entrance)
  • Clean out gully in Hall E & flow test on completion
  • All covers which were inspected/cleaned were identified with spray paint – foul water covers were marked with red spray and surface water drains were marked with blue spray.
  • Access to internal drains was very limited due to floor coverings, a lack of drawings, and movements by other contractors
  • Checking and flushing of accessible manholes & gullies in the Mortuary
  • Saw-cutting & breaking out of the existing tarmac in the service yard to form road crossings for dropping temporary power cables (from generators) below finished road level (plated over by others).