Client : | Tilbury Douglas | Value : | £12.2m | Location : | Rotherham South Yorkshire | Time : | 4 Years |
- Precast twin wall 12m high wood store bunker walls
- Wood store pit and headwall – 6m high single sided RC walls, suspended headwall, jump form in-situ walls 12m high
- Bridge abutments and concrete deck
- Turbine bed – 2.4m thick concrete base on 6m high RC plinths and vibration pads
- Flood walls surrounding all key buildings including new substation and transformer blast walls
- Dry-shake power float floor slabs, grouted tarmac & concrete brushed finished yard areas
- All associated drainage, roads, yard slabs, grouted asphalt & hard landscaping
- Substation
Really pleased with the quality of workmanship
We were really pleased with the quality of workmanship. The Moortown Group’s health and safety policies were also in keeping with our high standards as was the overall management and general housekeeping onsite.
David Dixon
Contracts Manager, Tilbury Douglas